Arch Bridge Bad Brambach
DB Route Plauen - Eger
Services
Structural condition:
- Material assessment of components made of natural stone masonry
- Preliminary design for the restoration of existing natural stone masonry structures (Service Phase 3 according to HOAI)
- Preparation of tender documents for the restoration of natural stone masonry structures (Service Phases 6 and 7 according to HOAI)
- Technical supervision of the restoration works on natural stone masonry structures (Service Phase 8 according to HOAI)
Geotechnics:
- Geotechnical report on subsoil and foundation conditions
- Technical support and consulting as well as quality assurance and control testing for earthworks and foundation engineering during construction
Waste Management:
- Investigation and assessment of excavated materials as part of the design planning
- Technical supervision, inspections, and consulting during construction
- Coordination of the accompanying documentation procedure and registration in ZEDAL
Client
DB InfraGO AG, Dresden
alle Projekte alle Bahnbau-Projekte alle Railway Engineering-Projekte