Upgraded line Hamburg – Berlin
Instrumentation and monitoring of the load-bearing system constructed in 2003
Contract
Measurement-based monitoring of the constructed support system, consisting of a geogrid-reinforced base layer over partially grouted rammed columns
Client
MOVENTE GmbH
Geotechnik und Baugrunddynamik
Assmannstraße 9
93049 Regensburg
Services
- Dynamic measurements to determine vibration velocities in the superstructure as well as in the subsoil and substructure
- Inclinometer measurements (conducted by the company intermetric)
- Geodetic measurements of rails and settlement markers (conducted by the company intermetric)
- Sleeper void detection measurements (conducted by DB Netz AG, TZF Minden)
- Documentation and evaluation of the results in annual measurement reports