Upgraded line Hamburg – Berlin
Instrumentation and monitoring of the load-bearing system constructed in 2003

Excavator on ground levelling with overhead line masts

Area

Railway Engineering

Place

Upgraded line  Hamburg – Berlin
2nd upgraded stage, construction section Paulinenaue – Friesack

Contract

Measurement-based monitoring of the constructed support system, consisting of a geogrid-reinforced base layer over partially grouted rammed columns

Client

MOVENTE GmbH
Geotechnik und Baugrunddynamik

Assmannstraße 9
93049 Regensburg

Services

  • Dynamic measurements to determine vibration velocities in the superstructure as well as in the subsoil and substructure
  • Inclinometer measurements (conducted by the company intermetric)
  • Geodetic measurements of rails and settlement markers (conducted by the company intermetric)
  • Sleeper void detection measurements (conducted by DB Netz AG, TZF Minden)
  • Documentation and evaluation of the results in annual measurement reports

alle Projekte alle Railway Engineering-Projekte