Chemnitz Viaduct
DB Route Dresden - Werdau
Services
Structural Fabric:
- Material assessment reports for the existing abutments made of natural stone masonry and pier foundations constructed from conglomerate concrete
- Preliminary design planning for the rehabilitation of the existing natural stone masonry structures (Service Phase 3 according to HOAI)
- Preparation of tender documents for the rehabilitation of the existing natural stone masonry structures (Service Phases 6 and 7 according to HOAI)
- Technical supervision and consulting for the rehabilitation of existing structures made of natural stone masonry and concrete
Geotechnics:
- Geotechnical report on subsoil and foundation conditions
- Geotechnical verification of the existing arch foundations as part of the detailed design phase
Client
DB Netz AG, Dresden, Germany