Capacity upgrade of diversion tunnel

Mouth of the diversion tunnel with outlet into the existing stilling basin of the high-water relief system

Area

Hydraulic Engineering

Place

Dam Malter

Services

  • Research and review of existing documentation
  • Development of the site investigation program; preparation of tender documents for exploration works and laboratory testing
  • Construction supervision of subsoil investigation boreholes and material sampling via structural core drilling, including the associated laboratory testing
  • Structural condition assessment and estimation of remaining service life, with recommendations for future monitoring during continued use

Client

Landestalsperrenverwaltung des Freistaates Sachsen
Betrieb Oberes Elbtal
Am Viertelacker 14
0259 Dresden

over:

HPI – Hydroprojekt Ingenieurgesellschaft mbH
Regionalbereich Ost – Dresden
Ludwig-Hartmann-Straße 40
01277  Dresden

alle Projekte alle Hydraulic Engineering-Projekte