Residential building Sachsenplatz
Services
- Preparation of geotechnical report
- Retaining structure design (phases 4 to 7) 2020–2021 (anchored soldier beam and lagging wall / anchored soldier beam with shotcrete infill / contiguous bored piles underpinning adjacent buildings; maximum excavation depth approx. 7.5 m)
- Design of bored pile foundation with individual piles
- Design of closed groundwater control system for excavation works
- Geotechnical specialist construction supervision
Client
FLÜWO Bauen Wohnen eG